OBJECTIVES

The LIFE WASTE2BIOFUEL project aims to solve a serious environmental problem caused by the accumulation of waste in EU landfills

SUMMARY

The LIFE WASTE2BIOFUEL project aims to reduce the impact that incorrect waste management has on air, water and soil ecosystems. To this end, LIFE WASTE2BIOFUEL will develop an Integrated Gasification Fischer-Tropsch (IGFT) process for the thermal treatment of the biomass fraction of Municipal Solid Waste (MSW). The system shall allow treating the target waste through an energy sustainable and environmentally friendly process.

waste2biofuel rendimiento combustible liquido

To assess the technological performance of the IGFT process
To validate that it is possible to convert biowaste into liquid fuels in an energy self-sufficient way.

sostenibilidad ambiental - waste2biofuel

To assess the environmental sustainability of the IGFT
By means of performing LCA and LCC of the system.

Viabilidad economica de lifewaste2biofuel

To assess the economic viability of the IGFT process
Through developing feasibility studies of industrial scale plants in order to plan bankable projects.

Reducir emisiones con life waste2biofuel

To reduce GHG emissions and air pollutants
To minimize the rate of waste disposed in landfills and the waste refused fraction.

Tratamiento de residuos con life waste2biofuel

To implement and promote a new waste treatment model
That indeed considers landfilling a “last choice” according to the waste management hierarchy.

Biocombustibles

To demonstrate the replicability and transferability during and after its implementation
Through knowledge, useful networking, technology and business model transfer strategy.

Directives - waste - project life waste2biofuel

WASTE POLICES

Landfill Legislation (Directive 1999/31/EC). Ley 22/2011, de 28 de julio, de residuos y suelos contaminados.
Directives energy - project lifewaste2biofuel

ENERGY POLICES

Renewable energy policies (Directive 2009/28/EC). Biofuels legislation (Directive 2015/1513/EC).

THE CHRONOGRAM OF THE PROJECT

ACTIONS 2017 2018 2019 2020
I II III IV I II III IV I II III IV I II III IV
A. Preparatory actions (if needed)
A1. Preliminar analysis of th pilot plant implementation
B. Implementation actions (obligatory)
B1. Basic design of the pilot plant
B2. Construction of the pilot plant
B3. Validation of the pilot plant
B4. Replicability and transferability of the system
C. Monotoring of the impact of the project actions (obligatory)
C1. Monitoring the environmental impact (indicators) and LCA
C2. Monitoring of socio-economic impact
D. Public awareness and dissemination of results (obligatory)
D1. Dissemination planning and execution
D2. Especific communication and dissemination activities for Public Awareness
E. Project managament (obligatory)
E1. Technical and administrative management
E2. After-LIFE Plan
A1. Preliminar analysis of th pilot plant implementation
2017 I II III IV
2018 I
II III IV
B1. Basic design of the pilot plant
2018 I
II
III
IV
B2. Construction of the pilot plant
2018 I II
III
IV
2019 I
II III IV
B3. Validation of the pilot plant
2019 I
II
III
IV
2020 I
II
III
IV
B4. Replicability and transferability of the system
2018 I II III IV
2019 I
II
III
IV
2020 I
II
III
IV
C1. Monitoring the environmental impact (indicators) and LCA
2018 I
II
III
IV
2019 I
II
III
IV
2020 I
II
III
IV
C2. Monitoring of socio-economic impact
2018 I
II
III
IV
2019 I
II
III
IV
2020 I
II
III
IV
D1. Dissemination planning and execution
2018 I
II
III
IV
2019 I
II
III
IV
2020 I
II
III
IV
D2. Especific communication and dissemination activities for Public Awareness
2018 I
II
III
IV
2019 I
II
III
IV
2020 I
II
III
IV
E1. Technical and administrative management
2017 I II III IV
2018 I
II
III
IV
2019 I
II
III
IV
2020 I
II
III
IV
E2. After-LIFE Plan
2020 I
II
III
IV